Ganche access road
Skardu Khaplu Hushe Road Update Today
OpenSkardu — Khaplu — Hushe is marked open in the latest available update (17 Oct 2026, 12:17 AM PKT). 1 of 2 recorded segments need caution or are closed — see the timeline below. Mountain conditions change fast; check recent reports before you leave.
Khaplu Hushe road update — Skardu to Ganche district status. Road is Open .This route heads east from Skardu into Ganche district, passing through Khaplu (home to the restored Khaplu Palace) and continuing to Hushe Valley, a starting point for treks toward Masherbrum and K2 base camp routes. The drive from Skardu to Khaplu takes roughly 2-3 hours, with a further 1-2 hours to reach Hushe. Road conditions are generally manageable in summer but can be affected by landslides or snow at higher points earlier and later in the season. This route sees far less traffic than the main Skardu-based roads, so services and fuel stops are limited.
Last updated 2 days ago · Last checked: 19 Oct 2026, 1:00 PM PKT
- 1OpenSkardu → Khaplu103 km 2h 30m
- 2ClosedKhaplu → Hushe60 km 2h
Blocked at Rot Lungba.
Frequently asked questions
Is the Skardu Khaplu Hushe road open today?
The latest available update (17 Oct 2026, 12:17 AM PKT) marks Skardu — Khaplu — Hushe as open. Conditions in the mountains can change quickly, so check this page and recent reports before you leave.
What is the condition of the Skardu Khaplu Hushe road?
1 of 2 recorded segments need attention: Khaplu → Hushe (closed). Last updated 17 Oct 2026, 12:17 AM PKT.
How long does it take to travel the Skardu Khaplu Hushe road?
Recorded segment travel times: Skardu → Khaplu about 2h 30m; Khaplu → Hushe about 2h. Actual time depends on weather, traffic and road works.
How can I report a blockage on the Skardu Khaplu Hushe road?
Use the Submit an update page to share a blockage or clearance with a photo. Reports are reviewed before they appear on the site. In an emergency, call Rescue 1122.
