Routes

Live road status

Check the latest available road conditions across major routes in Gilgit-Baltistan. Road statuses are based on the latest available updates recorded by Gilgit Road Updates — tap a route for segments, travel times and the full timeline.

Astore-Valley-Road-AVR

Astore Valley Road (AVR)

Open

Astore Valley Road Live Update - The Astore Valley Road (AVR) Road is Open .

Updated 2 days agoView timeline

Jaglot-Skardu-road

Jaglot-Skardu Road (JSR)

Open

Jaglot Skardu Road Update live , The Jaglot–Skardu Road (JSR) Road is Open

Updated 1 day agoView timeline

N-35 · Hasan Abdal → Khunjerab

Karakoram Highway (KKH)

Open

KKH road update today — live status of the kkh. Road is now reopened for all kind of traffic.The Karakoram Highway connects Islamabad to Gilgit, covering approximately 600 km through Abbottabad, Mansehra, Besham, and Chilas before reaching Gilgit city. The journey typically takes 14-18 hours by road, though most travelers break it into two days with an overnight stop in Besham or Chilas. This route is considered one of the most scenic mountain highways in the world, running alongside the Indus River through dramatic gorges and high peaks. The stretch between Besham and Chilas is the most landslide-prone section, especially during monsoon season (July-August) and spring snowmelt. Road conditions can change quickly, so checking current status before departure is strongly recommended.

Updated 1 day agoView timeline

S-1 · via Jaglot & Rondu

Gilgit — Skardu Road

Open

Skardu road update today — live status of the Gilgit-Skardu route. The Road is Open as of Now, according to GB Police Officials .The Gilgit-Skardu road links Gilgit city to Skardu, the gateway to K2, Deosai National Park, and Baltistan's major attractions. The route covers roughly 200 km and takes approximately 6-7 hours, passing through Jaglot and following the Indus River valley. Recent road improvements connecting Skardu directly to the Karakoram Highway have significantly reduced travel times compared to previous years. This road can experience delays due to landslides, particularly during monsoon season, and occasional construction work along the Sassi-Skardu stretch. Travelers heading to Deosai or Shigar Valley typically use Skardu as their base after this drive.

Updated 1 day agoView timeline

KKH branch · via Nomal & Chalt

Gilgit - Hunza Road

Open

Hunza road today — live status of the Gilgit-Hunza route.Road is Open.The Gilgit-Hunza road is one of the more reliable routes in Gilgit-Baltistan, covering approximately 100 km along the Karakoram Highway and taking 2.5-3 hours to Karimabad, Hunza's main town. The route passes scenic stretches along the Hunza River, with Rakaposhi visible for much of the drive. While generally well-maintained, this road does experience occasional landslides, especially around the Attabad Lake tunnels during heavy rain. Regular vans and private taxis operate this route daily, making it one of the more accessible drives in the region for tourists heading to Karimabad, Attabad Lake, and Passu.

Updated 1 day agoView timeline

via Ghizer & Shandur Pass

Gilgit — Chitral (Shandur)

Open

Gilgit Chitral road update — live status via Shandur Pass road is Open . The Gilgit-Chitral route connects Gilgit to Chitral via the Shandur Pass, one of the highest polo grounds in the world, passing through Ghizer district along the way. This route is only accessible during summer months (roughly June to October), as Shandur Pass closes completely with winter snowfall. The road passes through remote, high-altitude terrain and is less developed than the KKH, meaning travel times can vary significantly based on conditions — typically 8-10 hours depending on the season and road state. This route is popular with adventure travelers and those attending the annual Shandur Polo Festival, but requires careful planning and current road status checks given its remote, weather-dependent nature.

Updated 2 days agoView timeline

KKH lower section

Besham — Dasu — Chilas

Open

KKH road update today — Besham to Chilas section status.Road is Open . This stretch forms the middle portion of the Karakoram Highway, connecting Besham through Dasu to Chilas. It runs through some of the most rugged terrain on the entire KKH, cutting along steep river gorges above the Indus. This is historically the most landslide and rockfall-prone section of the whole Islamabad-Gilgit journey, with occasional road-widening and dam-related construction work near Dasu adding to delays. Travelers on this stretch should always check current conditions before departure, and avoid night driving given the narrow, winding sections with limited visibility.

Updated 2 days agoView timeline

KKH · via Raikot & Jaglot

Chilas — Tatta Pani — Gilgit

Open

Gilgit road update today — Road is Open .Chilas to Gilgit final stretch status. This segment covers the final stretch of the KKH journey from Chilas into Gilgit city, passing through Tatta Pani along the way. It typically takes 3-4 hours and marks the last leg before reaching the region's main transport hub. Like other sections of the KKH, this stretch can experience landslide-related delays, particularly during monsoon season. Fuel and food stops are more frequent on this segment compared to the more remote Besham-Dasu-Chilas stretch.

Updated 1 day agoView timeline

Summer alternative to KKH

Naran — Babusar Top — Chilas

Closed

Babusar Top road update — seasonal route status. ROAD IS Closed For the latest situation of the road and travel information, please contact the Gilgit-Baltistan Police helpline "Pukar 15." (Spokesperson, Gilgit-Baltistan Police) Gilgit-Baltistan Police This is the alternate, seasonal route into Gilgit-Baltistan via Naran in the Kaghan Valley, crossing Babusar Top (around 4,170 meters) before descending into Chilas. It offers some of the most scenic high-altitude views in the region but is only usable from roughly May/June to October, closing completely with the first heavy snowfall. Babusar Top itself can be affected by fog, snow, or landslides even within the open season, so this route requires more careful planning than the main KKH. It's a popular choice for travelers wanting to combine a Kaghan Valley visit with their journey into Gilgit-Baltistan

Updated 1 day agoView timeline

Astore Valley road

Jaglot — Astore — Rama

Open

Jaglot Astore road update — Rama Meadows access status Road is Open .This route branches off from the Gilgit-Skardu road at Jaglot and heads into Astore Valley alcontinuing on to Rama Meadows with its close-up views of Nanga Parbat. The drive from Jaglot to Astore town takes roughly 2-3 hours, with a further short drive or hike to reach Rama. The road is narrower and less developed than the main KKH or Gilgit-Skardu routes, with jeep tracks required for the final approach to Rama Meadows. It's generally accessible from late spring through autumn, with winter snow restricting access to higher points.

Updated 2 days agoView timeline

Deosai plateau crossing

Skardu — Deosai — Astore

Open

Deosai road update today — Skardu to Astore plateau status.Road is Open. This route crosses the Deosai Plains, one of the highest plateaus in the world, connecting Skardu to Astore. The drive takes approximately 4-6 hours depending on conditions, passing Sheosar Lake near the midpoint of the plateau. This route is only open from late May/June to September, as Deosai is completely snowbound the rest of the year. The unpaved sections across the plateau can become difficult after rain, and services along the way are extremely limited, so travelers should carry extra fuel, food, and water.

Updated 2 days agoView timeline

Ganche access road

Skardu — Khaplu — Hushe

Open

Khaplu Hushe road update — Skardu to Ganche district status. Road is Open .This route heads east from Skardu into Ganche district, passing through Khaplu (home to the restored Khaplu Palace) and continuing to Hushe Valley, a starting point for treks toward Masherbrum and K2 base camp routes. The drive from Skardu to Khaplu takes roughly 2-3 hours, with a further 1-2 hours to reach Hushe. Road conditions are generally manageable in summer but can be affected by landslides or snow at higher points earlier and later in the season. This route sees far less traffic than the main Skardu-based roads, so services and fuel stops are limited.

Updated 2 days agoView timeline

K2 trailhead road

Skardu — Shigar — Askole

Open

Shigar Askole road update — K2 base camp access status. Road is Open .This route connects Skardu to Shigar Valley and continues to Askole, the last road-accessible village before trekking routes into the Karakoram's highest peaks, including K2. The drive to Shigar takes about an hour, with the continuation to Askole taking several more hours over increasingly rough terrain. The Askole stretch is a rugged jeep track rather than a paved road, and is only reliably accessible in summer. This route is primarily used by trekkers and expedition teams heading into the Baltoro region, so checking current conditions before departure is essential given the remoteness.

Updated 2 days agoView timeline

Airport Road · Jutial · Konodas

Gilgit City Roads

Open

Gilgit city road update today — local status. Gilgit city serves as the administrative and transport hub of Gilgit-Baltistan, connecting onward routes to Hunza, Skardu, Chitral, and Islamabad. Local roads within and around Gilgit city are generally well-maintained and rarely affected by major closures, though nearby routes like the road to Naltar Valley can experience seasonal restrictions due to snow. Gilgit city is the natural starting and ending point for most journeys through the region, with the airport, bus terminals, and main markets located centrally. Travelers typically use Gilgit as a base to arrange onward transport to any of the region's major destinations.

Updated 2 days agoView timeline

Mansehra → Naran → Babusar

Naran — Kaghan Valley

Open

Naran road update today — Kaghan Valley statusRoad is Open. This route covers the scenic Kaghan Valley stretch leading up to Naran town, a popular gateway for travelers heading toward Babusar Top and onward into Gilgit-Baltistan. The valley is known for lush green meadows, Lake Saif-ul-Malook (a short drive/hike from Naran), and dense pine forests along the way. This route is seasonal, generally accessible from April/May through October, with the upper sections becoming difficult or impassable in heavy snow. It sees heavy tourist traffic in summer, particularly on weekends, which can add congestion-related delays separate from weather or landslide issues.

Updated 1 day agoView timeline

Gahkuch → Phander → Shandur

Gilgit — Ghizer — Shandur

Open

Gilgit Ghizer road update — Shandur Pass access status.Road is Open This route heads west from Gilgit into Ghizer district, passing through Gupis and Phander before reaching the Shandur Pass area. It offers access to some of the region's quieter alpine valleys, including Phander Valley's turquoise lake, before continuing toward the high-altitude polo grounds at Shandur. Like other Shandur-area routes, this road is only reliably open from June to October, closing with the first significant snowfall. Road quality varies along the way, with some stretches unpaved, particularly closer to Shandur itself.

Updated 2 days agoView timeline

Karimabad → Sost → China border

Hunza — Sost — Khunjerab

Open

Hunza Khunjerab Road Update - Live Road Status The Road is Open .This route heads west from Gilgit into Ghizer district, passing through Gupis and Phander before reaching the Shandur Pass area. It offers access to some of the region's quieter alpine valleys, including Phander Valley's turquoise lake, before continuing toward the high-altitude polo grounds at Shandur. Like other Shandur-area routes, this road is only reliably open from June to October, closing with the first significant snowfall. Road quality varies along the way, with some stretches unpaved, particularly closer to Shandur itself.

Updated 2 days agoView timeline

Nagar → Hopper glacier

Nagar — Hopper Valley

Open

Nagar Hopper road update — Hunza to Hopar status. This route branches from the main Hunza area into Nagar district, leading to Hoppar (Hopper) Valley, known for its glacier views and trekking access points, including routes toward Rakaposhi base camp. The drive from Karimabad to Hopar takes approximately 30-45 minutes. Road conditions are generally manageable for most of the year in the lower valley, though higher trekking-access points can be affected by seasonal snow. This is a popular short excursion for travelers already based in Hunza.

Updated 2 days agoView timeline

Skardu → Shigar → Askole

Shigar — Askole — Jhola

Open

Shigar Jhola road update — Baltoro trek access statusRoad is Open . This route extends from Shigar Valley toward Askole and Jhola, marking the final road-accessible points before trekking routes into the Baltoro Glacier region and K2 base camp. The terrain becomes progressively rougher, with jeep tracks replacing paved road for much of the later stretch. This route is only reliably accessible in summer months and is primarily used by trekking expeditions rather than general tourism, given its remoteness and limited services along the way. Checking current conditions before departure is essential, as this stretch is among the most isolated in the region.

Updated 2 days agoView timeline

Astore → Rama meadows

Astore — Rama Lake

Open

Rama Lake road update — Astore access status. Road is Open This short route connects Astore town to Rama Lake and the surrounding meadows, offering some of the closest accessible views of Nanga Parbat's Rupal face. The drive from Astore takes approximately 30-45 minutes on a mostly jeep-track road. Access is generally reliable from late spring through early autumn, with winter snow restricting the route. This is a popular half-day excursion for travelers based in Astore, often combined with a visit to Rama Meadows itself.

Updated 2 days agoView timeline

Khaplu → Hushe village

Khaplu — Hushe — Masherbrum

Open

Hushe Masherbrum road update — Khaplu access status. OPEN NOW.

Updated 2 days agoView timeline

KKH bypass via Babusar

Chilas — Babusar Alternate

Closed

Chilas Babusar road update — alternate route status.Closed NOW , This route describes the alternate connection between Chilas and the Babusar Top area, used as a secondary link between the Karakoram Highway and the Kaghan Valley route when conditions on one road affect travel plans. It offers travelers a fallback option during localized closures. Given its role as an alternate route, conditions here can vary significantly by season, and it typically sees less maintenance priority than the main KKH. This route is only viable in the warmer months, in line with Babusar Top's own seasonal access window.

Updated 1 day agoView timeline

Seen a blockage or clearance?

Share an update — help travellers behind you.